South Africa: the R2.2 trillion IRP 2025 and Eskom unbundling test whether the end of load shedding can last
Objective
Assess whether South Africa's Integrated Resource Plan 2025 and the approved next stage of Eskom's unbundling can convert the recovery in power supply since 2024 into durable energy security, and what the R2.2 trillion investment programme means for coal, renewables and electricity prices.
Methodology
Review of the Department of Electricity and Energy's IRP 2025 launch of 19-20 October 2025, Eskom's statement of 9 December 2025 on ministerial approval of its revised unbundling strategy, and independent coverage by Argus Media and Ecofin Agency.
Capacity targets, timelines, cost figures and performance data were compared across sources, and the unbundling structure was checked against the Electricity Regulation Amendment Act framework. Descriptive policy analysis; no independent modelling of tariffs, grid capacity or emissions was undertaken.
Findings
South Africa's electricity story changed twice in the last quarter of 2025. 5 billion) programme to add 105,000 MW of new generation capacity by 2039, more than double Eskom's current installed capacity. 3 GW of new nuclear, expandable to 10 GW.
The plan targets deep emissions cuts, 160 million tonnes of CO2 equivalent by 2030 and 142 million tonnes by 2035, and it raises the minimum load factor for gas-to-power plants to 50 percent to cover the decommissioning of 8 GW of coal capacity by 2030. The plan arrives on the back of a genuine operational recovery.
Eskom's energy availability factor reached 70 percent on more than twenty occasions between August and September 2025, against below 50 percent a year earlier, and by 17 October the country had completed 154 consecutive days without load shedding.
In September 2025 Unit 6 at Kusile Power Station entered commercial operation, completing the Medupi and Kusile build programme at 9,600 MW combined, and in November 2025 Koeberg Nuclear Power Station secured a 20-year licence extension, keeping 1,860 MW of baseload power running until 2045.
The second change came on 9 December 2025, when the minister approved Eskom's revised unbundling strategy.
Instead of three fully separate companies, Eskom Holdings will become a holding company with subsidiaries: the National Electricity Distribution Company of South Africa (NEDCSA), GenerationCo, Eskom Green for renewables, and the National Transmission Company South Africa (NTCSA), which was legally separated in July 2024.
A new independent Transmission System Operator will sit outside Eskom, and the Electricity Regulation Amendment Act requires it within five years, with the overall transformation aimed for completion by 2030. Eskom Green starts with a pipeline to add at least 2 GW of renewable capacity by 2026. But the structure carries a warning.
3 billion programme backed by European countries, expected, and could threaten further disbursements. 6 billion on 31 March, up 27 percent on the year.
The transition still needs about 14,000 kilometres of new transmission lines at an estimated R440 billion, while the Renewable Energy Independent Power Producer Procurement Programme has approved 122 projects totalling 11,500 MW, with 7,825 MW at financial close.
The conclusion is that South Africa has bought itself breathing room, not a solved transition: the lights are on, the plan is funded on paper, but the governance of unbundling and the tariff question will decide whether the IRP 2025 becomes infrastructure or another document.
Key Assumptions
- •The IRP 2025 figures are as announced by the Minister of Electricity and Energy, Kgosientsho Ramokgopa, on 19-20 October 2025.
- •Eskom's generation performance data are as reported by the utility itself.
- •The JETP funding risk reflects creditor and diplomatic assessments reported in the press, not an official withdrawal notice.
Limitations
- •The IRP 2025 is a plan, not committed funding; actual investment depends on tariffs, procurement and private capital.
- •The plan does not set out a tariff path, so affordability effects cannot be assessed.
- •JETP funding risk is based on creditor and diplomatic statements, not an official funding decision.
Discussion
Discussion (1)
The R2.2 trillion price tag is a fantasy if the state doesn’t first address the catastrophic grid constraints and the political resistance to decommissioning failing coal plants. How can we trust a 105,000 MW expansion plan when the national utility still struggles to integrate the independent power producers already knocking on the door?
Share
Evaluation Scores
Data Sources
Eskom: Eskom welcomes ministerial approval for the next stage of separation
official
Reliability: 90%
Accessed: Nov 7, 2026
Ecofin Agency: South Africa Unveils $127 Billion Energy Plan to Drive Economic Recovery
news
Reliability: 75%
Accessed: Nov 7, 2026
Argus Media: S Africa plans $127bn investment to phase out coal
news
Reliability: 80%
Accessed: Nov 7, 2026